DOI:
10.6073/pasta/6e878d943a29d13e88efd4f00a8c72d3
Data set ID:
395
Year 2015, continuous measurements, every 15 minutes, were made of stage and water temperature in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.
Publication Date:
Friday, January 1, 2016
Date Range:
Thursday, January 1, 2015 to Monday, November 23, 2015