DOI:
10.6073/pasta/2dde8566e58b53886f7a674c54eb071f
Data set ID:
117
Year 2001 continuous measurements, every 15 minutes, were made of stage, water temperature, conductivity, dissolved oxygen, and pH in a small headwater stream, Saw Mill Brook, Burlington, draining a highly suburban catchment (72% residential). Measurements are for part of the ice free season (June – December). Discharge is determined from stage using discharge vs stage regressions. Several day gaps occur periodically due to removal for recalibration.
Publication Date:
Sunday, December 12, 2004
Date Range:
Friday, June 22, 2001 to Sunday, December 16, 2001