DOI:
Data set ID:
Year 2011, continuous measurements, every 15 minutes, were made of stage and water temperature in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.